10,000+ systems. 20+ states. Names you know.
From Radisson, Marriott, Fairmont and Hilton to NIMS, Bosch, Bajaj and ACC, organisations that can’t afford hot-water failures rely on Tempratech.
Where Tempratech systems are running.
Client organisations that have specified Tempratech heat pumps. Model schedules and measured savings are shared per project on request.
16 results
Radisson
Centralized hot water · details on request
Marriott
Centralized hot water · details on request
Fairmont
Centralized hot water · details on request
Hilton
Centralized hot water · details on request
Lemon Tree
Centralized hot water · details on request
Ramada
Centralized hot water · details on request
NIMS
24/7 hot water · details on request
Mahatma Gandhi Hospital
24/7 hot water · details on request
Balaji Soni Hospital
24/7 hot water · details on request
Royal Ensign Apartment
Group housing · details on request
Mahima Group
Developer projects · details on request
Eisha Zenith
Group housing · details on request
Bosch
Process hot water · details on request
Bajaj
Process hot water · details on request
ACC
Process hot water · details on request
Mahindra
Process hot water · details on request
Client list per Tempratech’s approved proof bank. Photographs, model schedules and measured savings are added per project as the client releases them.
Three projects, told properly.
Flagship hospitality case study
The lead story on this page: property type and size, the model schedule installed, what it replaced, and the measured before/after energy or cost figure. Ready to fill as soon as Tempratech confirms the numbers.
- Property, location and room count (or anonymised description)
- Model schedule and storage volume
- Verified saving, and the basis it’s calculated on
- One quote from the client’s engineering team
Every savings figure on this site is shown with the basis it was calculated on. Published comparison: about ₹10 of hot water per 100 L against ₹44 on electric, ₹32 on LPG and ₹23 on PNG — varying with utility rates. Project figures are only published once the client has confirmed them.
Healthcare case study
A hospital installation — bed count, redundancy arrangement, and how continuity of supply was maintained during changeover.
Industrial process-heat case study
A high-temperature installation — process temperature required, what it replaced, and the energy comparison.
What we can share on request.
Evaluating a system is easier with real references. Ask and we'll arrange these.
Reference project list
Installations in your sector and region, with model schedules where the client permits.
A site visit
See a running plant room of comparable size, and speak to the engineering team looking after it.
Sizing & savings estimate
A model selection and running-cost comparison worked on your own tariff and demand.
Let's find the right system for you.
Tell us your hot-water need and we'll recommend the right Tempratech model — free.