Homes & group housing

The running-cost line buyers actually read.

Central plant for towers and clubhouses, or per-flat units where metering matters. Either way, the maintenance charge stops being the thing residents complain about.

85%lower than electric geysers
2 hrsmorning peak window
6 yrstank warranty
A residential tower with three screened Tempratech plant enclosures at its base
The problem

Where residential hot water goes wrong.

01

Everyone showers at once

A tower’s draw-off is brutally peaked. Central schemes fail on storage, not on plant capacity.

02

Nobody agrees on who pays

Central hot water without per-flat metering turns into a monthly argument at the RWA meeting.

03

Geysers were cheap to install

And they are the single largest line in a resident’s electricity bill. The comparison only looks fair over a year.

What we specify

Central where it makes sense, per-flat where it does not.

Below roughly 40 flats per riser, per-flat units usually beat central plant on total cost and hassle.

TT-CM

Central plant per tower

One plant room per tower with stratified buffer storage and a balanced recirculation loop.

14–180 kWhot & cold
See the range →
TT-DM

Per-flat All-in-One

A single integrated unit per flat, individually metered — no shared cost, no allocation dispute.

to 75 °Cper-flat metering
See the range →
TT-SP

Clubhouse pool

Titanium exchanger pool heating for the amenity block, running year-round.

COP to 6.9titanium
See the range →
Also part of the scheme
  • Per-flat BTU metering where hot water is centrally generated
  • Balanced recirculation so the top floor gets hot water in under 30 seconds
  • Storage sized on the 6:30–8:30am peak, not on litres per flat
  • Resident handover pack and a session with the facility team
  • Optional cooling recovery for the clubhouse or gym
  • AMC priced per tower, transferable to the RWA at handover
Case study

A 60-villa community cut hot-water bills 71%.

Per-villa All-in-One units, individually metered, replacing 200 L electric geysers. Residents saw the change on the next bill, which ended the debate faster than any presentation.

71%lower resident bills
60villas converted
19 mopayback
See more projects
A row of villas, each with its own Tempratech monobloc unit beside the entrance
How it goes

From first call to handover.

Housing schemes live or die on the resident conversation, so we join it early.

Stage 1

Feasibility

Flat count, riser layout, existing geyser load and tariff slab.

Stage 2

Central vs per-flat

A costed comparison for the builder or the RWA, including metering.

Stage 3

Install

Phased by tower or by block, with a show flat first.

Stage 4

Handover

Resident guide, facility training and the AMC in the RWA’s name.

Comparing central plant against per-flat units?

Send us the riser drawing and flat count. We will cost both, honestly, including the metering.