India’s heat-pump specialist · 30 years of engineering
Homes & group housing

The running-cost line buyers actually read.

Central plant for towers and clubhouses, or per-flat units where metering matters. Either way, the maintenance charge stops being the thing residents complain about.

85%lower than electric geysers
2 hrsmorning peak window
5 yrscompressor warranty
residential tower / clubhouse
The problem

Where residential hot water goes wrong.

01

Everyone showers at once

A tower’s draw-off is brutally peaked. Central schemes fail on storage, not on plant capacity.

02

Nobody agrees on who pays

Central hot water without per-flat metering turns into a monthly argument at the RWA meeting.

03

Geysers were cheap to install

And they are the single largest line in a resident’s electricity bill. The comparison only looks fair over a year.

What we specify

Central where it makes sense, per-flat where it does not.

Below roughly 40 flats per riser, per-flat units usually beat central plant on total cost and hassle.

TT-CM

Central plant per tower

One plant room per tower with stratified buffer storage and a balanced recirculation loop.

14–180 kWhot & cold
See the range →
TT-DM

Per-flat All-in-One

A single integrated unit per flat, individually metered — no shared cost, no allocation dispute.

to 75 °Cper-flat metering
See the range →
TT-SP

Clubhouse pool

Titanium exchanger pool heating for the amenity block, running year-round.

COP to 6.9titanium
See the range →
Also part of the scheme
  • Per-flat BTU metering where hot water is centrally generated
  • Balanced recirculation so the top floor gets hot water in under 30 seconds
  • Storage sized on the 6:30–8:30am peak, not on litres per flat
  • Resident handover pack and a session with the facility team
  • Optional cooling recovery for the clubhouse or gym
  • AMC priced per tower, transferable to the RWA at handover
Case study

A 60-villa community cut hot-water bills 71%.

Per-villa All-in-One units, individually metered, replacing 200 L electric geysers. Residents saw the change on the next bill, which ended the debate faster than any presentation.

71%lower resident bills
60villas converted
19 mopayback
See more projects
villa community — All-in-One units
How it goes

From first call to handover.

Housing schemes live or die on the resident conversation, so we join it early.

Stage 1

Feasibility

Flat count, riser layout, existing geyser load and tariff slab.

Stage 2

Central vs per-flat

A costed comparison for the builder or the RWA, including metering.

Stage 3

Install

Phased by tower or by block, with a show flat first.

Stage 4

Handover

Resident guide, facility training and the AMC in the RWA’s name.

Comparing central plant against per-flat units?

Send us the riser drawing and flat count. We will cost both, honestly, including the metering.